1.All in English& Imperial Unit.全部使用英文和英制單位

2.Are part dimensions to print plus shrink?請檢查內(nèi)模尺寸有否乘縮水?

3.All wires protected from sharp corners?凡有電線通過的角位要改為R角,是否完成?

4.All replaceable components must be standard components.所有替換的元件必須是標(biāo)準(zhǔn)件。

5.Add shot counter?是否加啤塑總計(jì)器?

6.A complicated mould with thorough design consideration to overcome the numerous design contraints.一個復(fù)雜的模具,設(shè)計(jì)經(jīng)過周詳考慮,成功地克服了各種設(shè)計(jì)上的限制。

7.All moving components should use hardened steel : all slides should be installed with hardend or lubricated alloy wear plates and gibs, and with positive slide retainer.所有移動的零件應(yīng)使用硬鋼料,行位必須用硬墊板和硬線條,而且必須有限位及定位鎖。

8.BOM including water fittings,ejectors&custom components.BOM的內(nèi)容應(yīng)包含運(yùn)水接頭,頂針和自制的零件.

9.BeCu for lifters if w/o water circuits。若沒有運(yùn)水回路,斜頂為鈹銅。

10.Corresponding components mirrored at core&cavity對應(yīng)的部件在前、后模平面視圖中鏡像

11.Check polish for line of draw finish?有否省光就出模?

12.Core pull slot mechanism installed and O.K.

13.Crane capacity and loading clearance.模具須用多大吊機(jī)才可搬動。

14.Conduct moldflow &mold warp analysis.經(jīng)流道及變形電腦模擬分析。

15.Component and/or 3D mould design drawing.散件圖或3D模具圖

16.Cooling less important when dimensions are not important.若尺寸不重要,適量冷卻也可。

17.Combine a traditional 4 cavity edge gate and a 4 cavities reverse gate mould which help to double the moulding capacity and reduce production cost.將一個標(biāo)準(zhǔn)四模腔大水口模具與一個四模腔倒轉(zhuǎn)大水口模具結(jié)合成為一套可于同一大小的注塑機(jī),生產(chǎn)量可增加一倍的層板模具,并且可降低成本。

18.Can be seperated into two individual moulds for moulding in two different mould shops.此模具最大的特式是,可將模具分開變成兩套,在不同地方生產(chǎn),增加生產(chǎn)的靈活性。

19.Consists of all standard mould components which facilitates mould maintenance.由于全套模具均利用模具標(biāo)準(zhǔn)零件制成,在維修及換零件上比較方便。

20.Die draw called out出模方向的標(biāo)示

21.Dimension all the opening , travel & clearance標(biāo)出前、后模距離,滑動部件滑動距離和塑件脫離的位置

22.DME egr. Water fittings recessed and marked?是否使用DME運(yùn)水接頭及編號?

23.Delivery right side up , or in two halves?開箱后是否容易吊出模具及是否分開前/后模運(yùn)輸?

24.Eyebolt size and balance in 2 sides吊模孔尺寸,平衡,4邊都要有

25.Ejection stroke & slide, lifter travel dimensioned出行程、行位、斜頂行程的標(biāo)注。

26.Ejection study if lifter adopted若有斜頂,做出分析。

27.Ejection extended at the most頂出到極限位置

28.Ejector guide pins installation .頂針導(dǎo)柱的安裝。

29.Eyebolts for inserts more than 50lbs.重量大于50lbs的鑲件必須要有吊模孔。

30.Edge gate or sprue gate requiring secondary operation acceptable.邊緣型或直入型水口都可以接受。

31.4 point in HRC different to lifters contacting or cavity steel.斜頂和與其接觸的內(nèi)模或鑲件在硬度上有4度的差別(HRC)。

32.4X size section , dimensioned to reflect the actual size.水口及水口頂針的4倍放大視圖,按實(shí)際尺寸標(biāo)注。

33.General ,safety and handling 常規(guī)、安全和搬運(yùn)要求

34.Guided ejection recommended for mould above 100 tons clamp capacity, ejector pins of 1.5mm or smaller, or ejector stroke longer than 50mm.建設(shè)模具用于鎖模力超過100噸的注塑機(jī),或有1.5mm以下的頂針或頂出行程超過50mm時,應(yīng)裝上頂針板導(dǎo)柱。

35.Guide pin cleared and vented?邊釘插入模板有否頂著及加疏氣空?

36.Hot manifold wired to print and checked? 熱咀電線接位有否編號?

37.Horn pin clearance hole?斜邊與行位有否空間?

38.Hydraulic actuated slide together with electrical limit switch.行位采用油壓推動,配合安全電制。

39.Heaters fitted+0.002/-.000, leads tagged and connected to terminal.熱嘴裝配,電線源頭、尾有否安裝穩(wěn)固。(+0.002/.000)

模具行業(yè)英文溝通例句

40.Inserts keyed and numbered to prevent incorrect assembly.鑲件定位和編號以防止不正確的組裝。

41.Jaw angle 3 deg.more than angle pins(<25 degree).斜面角度要比行位斜邊角度大3度(<25度)。

42.Keep enough space to run waterline at slide /lifter/major inserts.在行位、斜頂、主要鑲件處保留足夠位置(空間)布置水槽。

43.Lifter angle less than 15 degree.斜頂角度小于15度。

44.Lifter rods dia, less than 1".斜頂桿直徑不能少于1"。

45.Limit switch in tact and protected.是否已安裝限位制?

46.Moldbase and steel dimensioned模坯和鋼料號的標(biāo)注

47.Minimum 5 deg.for shut-off.斜頂鑲件最小5度插穿。

48.Mechanism for sequence動作機(jī)構(gòu)是否正確?

49.Mold safety straps installed and painted red?是否已安裝安全帶及噴上正確顏色在模坯上?

50.Mould flow and simulation should be carried out for the best gate location, filling analysis, pressure distribution and heat distribution.

51. Mould should be designed with maximum cooling and with appropriate amount of ejection points.模具在設(shè)計(jì)上要做到盡快冷卻,上、下內(nèi)模高溫點(diǎn)應(yīng)該有個別的冷卻,應(yīng)有適量頂針。

52. Mould should be able to run fully automatic. Large part should be picked up by robot.模具能夠全自動生產(chǎn),大的零件應(yīng)由機(jī)械手拿出。

53. Mould should be tested to meet a defined Cpk quality standard.模具經(jīng)過測試,符合預(yù)定的Cpk質(zhì)量標(biāo)準(zhǔn)。

54. Mould should have safety features to protect accidental damage, incorrect assembly and set up of mould.模具應(yīng)具備可以預(yù)防意外損害及錯誤安裝等安全特性。

55. Mould halves requiring accurate alignment of core and cavity, and shut off should have appropriate part line locks.上、下模需要精確配合或有擦位的地方, 模具一定要有直身鎖。

56. Mould requiring heating should have insulator plate.需要加熱的模具,必須有隔熱板。

57. Mould preferred to run automatic; self-degating whenever possible.模具最好能自動生產(chǎn),模具盡可能自斷水口。

58. No obstructions on buttom surface of mold?模具必須穩(wěn)定位置如有凸出物請加腳座,是否完成?

59. Overall mold size of the moldbase & shut height模坯長寬和模厚(模架的長寬)

60. Outlets accessible and marked " IN OUT and NUMBER"?出入水位有否打上IN 、OUT 字碼?

61. Protruding items shown and protected。畫出突出部件并做好保護(hù)。

62. Parting line at the acceptable surface.合模分布在合理可接受的表面。

63. Put waterline as much as possible/wherever possible。盡可能布置多的運(yùn)水。

64. Put waterline for slide /lifter/insert wherever possible.盡可能在行位、斜、鑲件布置運(yùn)水。

65. Parting line cleared and released properly?分模線是否正確?

66. Proper locating ring and diameter?定位圈尺寸及直徑是否正確?

67. Proper radius and orifice on sprue bushing and keyed.唧嘴R及管釘是否正確?

68. Part line lock recommended when there is shut off.當(dāng)有擦位時,最好有直身鎖保護(hù)。

69. Protruding items shown and protected.如有零件凸出,模坯請加保護(hù)物。

70. Proper K.O. holes size and location.頂棍孔尺寸及位置是否正確?

71. Runners to be balanced. 流道必平衡。

72. Runners cross section type and size as per standard.流道切面形狀和尺寸符合標(biāo)準(zhǔn)。

73. Runner and parts should be ejected automatically .Multiple ejection should be avoided.頂出方法可使流道與產(chǎn)品自動掉下,避免運(yùn)用多次頂出方法。

74. Sufficient view and section足夠的視圖和切面圖

75. Safety Strap in red模塊藏入模坯,要涂成紅色。

76. Standing steel supported to keep stable.加撐腳以保前、后模能平穩(wěn)放置。

77. Support pillars>50% part projection area , steel :1040。撐頭面積大于50%的產(chǎn)品投影面積,材料:1040.

78. Safety strap clear tie bar?鎖模塊與哥林柱沖突嗎?

79. Sucker with reverse 10 deg. Undercut。10度倒扣的流道拉料桿。

80. Steel type & hardness of slide &heel blocks行位和壓條的料號和硬度。

81. Sufficient stroke of lifters(1/16"+ undercut size)?斜頂是否有足夠的行程(1/16”+倒扣尺寸)?

82. Sufficient stroke for floating plate?浮動板是否有足夠的行程?

83. Sufficient stroke as well as part and runner falls clear.是否有足夠的行程使品和流道脫落?

84. Spring around return pins and press ratio<33?是否有回針的彈簧及其壓縮比(<33%)?

85. Special instruction stamped on top and operator side?客戶如有特別指示請打在模坯頂及操作面上,有否完成?

86. Screws tight and all installed?螺絲是否全部收緊?

87. Support posts ground and screwed to clamp plate and pre-loaded.撐頭是否高出方鐵?

88. Spring pockets correct depth , spring deflection max.40%?全部彈弓壓縮比是否為1/3 S?

89. Standing steel well supported?成品與內(nèi)模之間的鋼材是否足夠?

90. Single drop of cold sprue gating is designed after moldflow analysis, which ensures a balance flow of plastic and easy for moulding.用moldflow分析決定產(chǎn)品的入水位置,使膠料分流平均,易于注塑。

91. Self-degating whenever possible .Hot runner system should be considered.……熱流道系統(tǒng)應(yīng)該加以考慮。

92. Standard components should be used.盡量使用標(biāo)準(zhǔn)件。

93. Semi-automatic and use of mould release acceptable.半自動工手放鑲件也可

94. Update title block/revision.更新標(biāo)題欄/版本

95. Use standard components when appropriate.適當(dāng)?shù)臅r候使用標(biāo)準(zhǔn)件。

96. View of deepest point最深點(diǎn)(位置)的剖切視圖

97. Water circuits should run out form the ejection box.運(yùn)水應(yīng)從出水槽中流出。

98. Waterlines clear tie bar and clamp slot?運(yùn)水是否同哥林柱和模槽有沖突?

99. Will mould fit in quoted press?可否配合客戶啤機(jī)?

100. Waterlines clear tie bars.運(yùn)水喉咀接駁位要離開啤機(jī)呵林柱咀接駁。

101. Waterline clear clamp slot.運(yùn)水喉咀接駁位要離開啤機(jī)碼模坑。

標(biāo)簽: 模具行業(yè)
主站蜘蛛池模板: 成人在线免费小视频 | 午夜视频国语 | 亚洲日韩国产一区二区三区 | 夫前人妻被灌醉侵犯在线 | 日本欧美一区二区三区视频 | 欧美在线播放一区 | 麻豆一区二区99久久久久 | 成人一区二区三区视频在线观看 | 免费看的黄网站 | 综合色播 | 天天做天天爱夜夜爽女人爽宅 | 人妻av资源先锋影音av资源 | 黄色电影在线免费观看 | 99在线精品免费视频九九视 | 最新版天堂资源中文官网 | 免费观看视频www | 热99精品 | 国产a区 | 2019精品手机国产品在线 | 亚洲色大成网站www 亚洲色大成网站www久久九九 | 色噜噜狠狠狠综合曰曰曰 | 日日摸天天摸爽爽狠狠97 | 亚洲精品高清国产一久久 | 亚洲国产成人精品无码区二本 | 一级黄色一级片 | 亚洲免费网站观看视频 | 国产精品 欧美 亚洲 制服 | 久久新地址| 欧美天天综合色影久久精品 | 久综合色 | 日本高清com | 天天操天天射天天插 | 日本高清视频在线三级 | 亚洲欧洲日产国码无码久久99 | 欧美精品国产aⅴ一区二区在线 | 国产高颜值大学生情侣酒店 | 48沈阳熟女高潮嗷嗷叫 | 久久aaaa片一区二区 | 九九热线有精品视频99 | 草莓视频69 | 99久久99视频 | 精品亚洲a∨无码一区二区三区 | 久色乳综合思思在线视频 | 欧美国产视频 | 香蕉国产成版人视频在线观看 | 日韩在线观看中文字幕 | 欧美五月激情 | 亚洲va无码专区国产乱码 | 成人网站偷拍澡AAAA | 精品香蕉一区二区三区 | 欧美一区二区三区在线视频 | 妺妺跟我一起洗澡没忍住 | 免费人成视频在线观看视频 | 婷婷玖玖 | av免费在线免费观看 | 欧洲成人一区二区三区 | 中文字幕被公侵犯的漂亮人妻 | 日本欧美视频在线观看 | AV国産精品毛片一区二区三区 | 麻豆changesxxx国产 | 羞羞视频网站在线观看 | 妇女毛片 | 国产精品无码av在线播放 | 日本午夜精品一区二区三区电影 | 国产成人久久 | 免费一级特黄3大片视频 | 图片区乱熟图片区小说 | 啊啊啊好紧好爽 | 国产午夜精品一区二区三区 | 青久久| 久久午夜神器 | 黑人巨大精品欧美一区二区免费 | 日本阿v无码观看dvd | 日韩在线精品 | 黄又色又污又爽又高潮动态图 | 婷婷久久五月天 | 99久久精品国产免看国产一区 | 日本啊v在线观看 | 国产浮力第一浮力 | 国产一级在线看 | 人妻丰满熟妇av无码区乱 | 国产乱人伦在线播放 | 青青在线香蕉精品视频免费看 | 中文字幕欧美人妻精品一区 | 四虎1515hhhcom| 蜜臀在线视频 | 日本最色网站 | 日本边添边摸边做边爱的网站 | 青青青国产成人久久111网站 | 国产精品久久久久久久免费大片 | 成人精品视频 成人影院 | 欧美日韩成人 | 免费国偷自产拍精品视频 | 一级观看免费完整版视频 | 午夜播放器在线观看 | 成人欧美一区二区三区黑人 | 亚洲中文字幕无码av永久 | 91在线观看视频 | 色欲av永久无码精品无码蜜桃 |